For the architect & contractor: update AutoCAD from this page without re-reading the whole site. Click any drawing to zoom.
v5 fixes the blank/JS drawings (now static), corrects the flooring divider + floor plan, deepens W6 so the observation window sits flush, simplifies the window to a 2-pane unit, adds the HVAC ceiling access panel and the HDMI video tie, and switches the desk to a bought unit. The acoustic targets (RT60 / NC / STC) are unchanged.

Change register (AutoCAD action per row)

Itemv4 (was)v5 (now)AutoCAD / contractor actionType
W6 partition (VO/Control)120 mm — 70 mm studs~200 mm — 150 mm DECOUPLED studsThicken W6; absorb the +80 mm from the buffer-spine side. Keep leaves decoupled (staggered / resilient channel).MAJOR
OW-1 observation window3-pane (6+100+10+75+8 ≈ 199 mm), 80×50 cm2-pane (8 + ~110 air + 12.8 laminated), STC 50, 80×55 cm, flush in W6Update window block size to 80×55 and the glazing build; window now sits flush (no box-out).MAJOR
Floor finish boundariesfinishes shown touching (no divider)vinyl (VO/Studio) & carpet (Control/Editing) each stop at the partition wallEnsure finish hatch boundaries terminate at wall faces, not across rooms.FIX
Floor plan (Drawing A)blank (JS-rendered)static accurate plan from verified dimensions.jsonUse the new static plan as the reference layout.FIX
HVAC ceiling accessnot shownAP-01 acoustic access panel(s) added to the RCPAdd STC-rated gasketed access panel locations to the reflected ceiling plan (coordinate w/ HVAC; off VO mic).ADD
Video tie cablingnot accountedHDMI-over-Cat6 extender (TX Control → RX VO Live) + HDMI leadsAdd the conduit/cable run Control↔VO Live for the HDMI extender.ADD
Studio deskbuild-on-site deskbuy ready-made (Glorious Sound Desk Pro / Zaor Miza)Replace the fabricated-desk detail with the bought desk footprint at the listening axis.CHANGE
HVAC units & silencersin acoustic BOMby HVAC contractor (spec handed over)No drawing change; procurement scope only.SCOPE
Green Glue placement(unchanged)confirmed board-to-board (CLD), never board-to-studCorrect any wall detail that showed GG on the studs.CLARIFY
All drawings~22 rendered blank (JS)rebuilt as static SVG + click-to-zoomDrawings now print/export reliably.FIX

Corrected drawings (v5)

Control RoomB311 · 5.43 m²VO LiveB304 · 5.31 m²Editing SuiteB312-2 · 8.56 m²Video StudioB312-1 · 11.23 m²D1 STC50 (entry)D2 STC45 (buffer spine, SE)D3 STC45D4 STC48OW-1 (80×55)N02 m
Floor plan (Drawing A) — was blank; now a static plan from verified geometry.
Control RoomB311 · 5.43 m²CARPETVO LiveB304 · 5.31 m²VINYLEditing SuiteB312-2 · 8.56 m²CARPETVideo StudioB312-1 · 11.23 m²VINYLD1 STC50 (entry)D2 STC45 (buffer spine, SE)D3 STC45D4 STC48OW-1 (80×55)N02 mFinishes are separated by the partition walls (hatched)vinyl and carpet never abut — the wall is the divider between rooms
Floor finish plan — vinyl & carpet now separated by the partition walls (the divider bug fixed).
VO LIVE CONTROL air gap ~110mm (+ desiccant) Outer pane: 8mm float (VO side) Inner pane: 12.8mm acoustic laminated (Control) tilted 5° (one pane) — breaks parallel-pane flutter Absorptive reveal (mineral wool) lines the jamb Neoprene isolation strip frame→structure; no rigid bridge Non-hardening acoustic sealant full perimeter (NOT foam) W6 stays DECOUPLED at 150mm staggered / resilient-channel studs — never a single stud bridging both leaves W6 wall = ~200 mm (150mm studs) window ~170 mm — sits FLUSH inside the wall (no box-out) Vertical section — tilt & sill finished floor W6 below sill sill 100 cm AFF head (frame) opening80 × 55 cm
OW-1 window — 2-pane, large gap, 5° tilt, flush in the 150 mm W6.