For the architect & contractor: update AutoCAD from this page without re-reading the whole site. Click any drawing to zoom.
v5 fixes the blank/JS drawings (now static), corrects the flooring divider + floor plan, deepens W6 so the observation window sits flush, simplifies the window to a 2-pane unit, adds the HVAC ceiling access panel and the HDMI video tie, and switches the desk to a bought unit. The acoustic targets (RT60 / NC / STC) are unchanged.
Change register (AutoCAD action per row)
Item
v4 (was)
v5 (now)
AutoCAD / contractor action
Type
W6 partition (VO/Control)
120 mm — 70 mm studs
~200 mm — 150 mm DECOUPLED studs
Thicken W6; absorb the +80 mm from the buffer-spine side. Keep leaves decoupled (staggered / resilient channel).
MAJOR
OW-1 observation window
3-pane (6+100+10+75+8 ≈ 199 mm), 80×50 cm
2-pane (8 + ~110 air + 12.8 laminated), STC 50, 80×55 cm, flush in W6
Update window block size to 80×55 and the glazing build; window now sits flush (no box-out).
MAJOR
Floor finish boundaries
finishes shown touching (no divider)
vinyl (VO/Studio) & carpet (Control/Editing) each stop at the partition wall
Ensure finish hatch boundaries terminate at wall faces, not across rooms.
FIX
Floor plan (Drawing A)
blank (JS-rendered)
static accurate plan from verified dimensions.json
Use the new static plan as the reference layout.
FIX
HVAC ceiling access
not shown
AP-01 acoustic access panel(s) added to the RCP
Add STC-rated gasketed access panel locations to the reflected ceiling plan (coordinate w/ HVAC; off VO mic).
ADD
Video tie cabling
not accounted
HDMI-over-Cat6 extender (TX Control → RX VO Live) + HDMI leads
Add the conduit/cable run Control↔VO Live for the HDMI extender.
ADD
Studio desk
build-on-site desk
buy ready-made (Glorious Sound Desk Pro / Zaor Miza)
Replace the fabricated-desk detail with the bought desk footprint at the listening axis.
CHANGE
HVAC units & silencers
in acoustic BOM
by HVAC contractor (spec handed over)
No drawing change; procurement scope only.
SCOPE
Green Glue placement
(unchanged)
confirmed board-to-board (CLD), never board-to-stud
Correct any wall detail that showed GG on the studs.
CLARIFY
All drawings
~22 rendered blank (JS)
rebuilt as static SVG + click-to-zoom
Drawings now print/export reliably.
FIX
Corrected drawings (v5)
Floor plan (Drawing A) — was blank; now a static plan from verified geometry.
Floor finish plan — vinyl & carpet now separated by the partition walls (the divider bug fixed).
OW-1 window — 2-pane, large gap, 5° tilt, flush in the 150 mm W6.