Back to Study Index

SSOT Verification Dashboard

Mathematical and visual verification of all floor plan SVGs against the single source of truth dataset

ALL CHECKS PASSED
0 / 0 checks passed

📌 Canonical S3 (acoustics5) Values — Manifest

MediaVerse S3 / acoustics5 — 3 production rooms + buffer spine (the former editing suite is removed; its footprint merged into the widened, high-ceiling Video/Podcast room). These are the single source of truth; if any other page disagrees, that page is wrong.

Room L × W × H (m) Area (m²) Volume (m³) Clear ceiling NC RT60 mid (s) Schroeder (Hz)
VO Live 3.19 × 1.33 × 2.75 4.24 11.66 2.75 m NC-12 0.217 273
Control Room 2.58 × 2.70 × 2.75 6.97 19.17 2.75 m NC-18 0.307 253
Video/Podcast 4.79 × 4.13 × 3.40 19.78 67.3 3.40 m (HIGH) NC-18 0.284 130

Shell (fixed): trapezoid S=737 / N=860 cm, depth 431–448 cm, gross 34.42 m². Columns COL-W & COL-E immovable. Buffer spine retained in the design as the audio↔video isolation break — a NEW BUILD on site (BOQ W-07; the shell is empty, S3-SITE-TRUTH §1). Height chain (Rev2 laser survey): slab 366.4 − 15 float floor − 76 plenum → 275 cm audio clear; Video/Podcast 366.4 − 15 − 11 compact decoupled ceiling = 340 cm clear. Doors: D1 STC50 90×220 (south→video), D3 STC45 80×220 (Control↔VO), D5 STC50 90×220 (Control external, opens out), OW-1 STC50 80×50 observation. D2 (buffer↔Control) and D4 removed — Control is entered only by external D5.

📐 Ground Truth Floor Plan

Generated 100% from MEDIAVERSE.* data — this is the reference all other SVGs must match

🚪 Door Positions

Door SSOT X (cm) SSOT Y (cm) SVG X (Y-flip) Orientation STC Location Status

🧱 Partition Positions

Partition DXF Y South DXF Y North SVG Y South SVG Y North Thickness STC Status

📏 Room Dimensions & Areas

Room L (m) W (m) Area (m²) L × W (m²) NC Target RT60 Target RT60 Achieved Status

🪟 Observation Window vs D3 — Overlap Check

Element X Start (cm) X End (cm) Y (cm) Width (cm) Status

🧱 Wall STC Ratings

Wall ID Name STC Thickness (cm) Layers Status

Comprehensive Verification Checklist