Treatment Layouts
Per-room placement — panels, bass traps, QRD, ceiling clouds, curtain · click any plan to zoom
VO Live (B304)
8 panels (N4 E2 W2) · 4 corner traps · manual curtain (N wall). NC-12 — densest treatment.
Control Room (B311)
2 panels [AC] (first reflections E/W) · 3 corner traps + 1 ceiling cloud · 2 QRD (rear/S).
Video Studio (B312-1)
13 panels (N6 S2 E3 W2) · 3 corner traps + 1 cloud · 2 QRD (S wall).
Editing Suite (B312-2)
4 panels [AC] (N2 S2) — required for RT60 · 2 corner traps (SW+SE).
Install corners-first (bass traps), then first-reflection panels (mirror method), then QRD/clouds. Step-by-step →
Build 08 — Treatment.