Stagebox & Signal Conduit Details
Signal infrastructure keeps the essential SB-01 VO Live link in Wall 6, and adds the SNK-2 wall-mount 16×4 stagebox in Video/Podcast with a 16ch multicore to the Control 48-pt patchbay (S3 BOQ SN-02/SN-04) alongside the local floor-box / recorder workflow. Stagebox, conduit sleeve, tray routing, and the Control Room rack landing are documented here for electrical and AV coordination.
Drawing 1 — SB-01 Face Plate
Center at 90 cm AFFFront elevation of the Control Room stagebox faceplate with balanced audio and utility terminations grouped by function.
Drawing 2 — Conduit Through W6
Both faces sealed [AC]Signal conduit crossing W6 uses a 50 mm EMT sleeve with a 10 mm annular gap and Tremco Fyre-Sil on both wall faces.
Drawing 3 — Cable Tray in Buffer Spine
SB-01 southbound + local Video/Podcast servicesA 150 mm wide tray rises through the buffer spine and separates the southbound SB-01 bundle from the Video/Podcast services. The SNK-2 16ch multicore (S3 BOQ SN-02) crosses the spine ONLY via the SN-03 penetration kit — under-floor EMT with stub-ups cast with the rafts, oversized steel sleeves OFFSET through BOTH spine leaves, RWA45-packed and sealed on both faces of both leaves.
Drawing 4 — Control Room Rack Layout
Apollo x4 landingThe Control Room rack receives the SB-01 bundle at the bottom and lands the patching hardware directly above the interface position for short analog tie lines.