HVAC Silencer Installation Details
The duct silencers are the controlling acoustic elements in the HVAC system. Each run must keep the stated straight lengths, hanger spacing, and plenum insulation so the calculated attenuation is actually achieved on site [AC].
Run Count
5 runs
Longest
Run A · 1500 mm
Critical Branch
B2 (Control, re-rated)
Hangers
600 mm max spacing
Run A — VO Live
1500 mm · 40 dB · 1.5 m/sLongitudinal Cross-Section
Installation Position
Run B — IDU-03 Trunk
1000 mm · 25 dB · 2.0 m/sLongitudinal Cross-Section
Installation Position
Run B1 — Control Room Branch
500 mm · 15 dB · 2.0 m/sLongitudinal Cross-Section
Installation Position
Run B2 — Control Branch (former Editing)
300 mm · 10 dB · 2.5 m/s maxLongitudinal Cross-Section
Installation Position
Run C — Video/Podcast
1000 mm · 25 dB · 2.0 m/sLongitudinal Cross-Section
Installation Position
IDU-03 Note
[HP] Confirm former Editing branch is capped before close-upIDU-03 serves the Control Room only. The former Editing branch is capped and sealed at the trunk, so no crossover duct remains. Run B1 and Run B2 both feed Control; B2 is retained and re-rated for Control (NC-18). Verify the capped branch is fully sealed at the trunk before close-up [HP].