Installation Sequence
The full build order — each step links to its IKEA-style guide
Build bottom-up and decoupled-first: float floor → walls → ceiling → openings → treatment → services → desk → commissioning. Hold points: HVAC NC before sealing ceiling, and door/window seals before sign-off.