Electrical Infrastructure

Power distribution, outlet positions, the essential SB-01 stagebox, cable routing, grounding, and conduit schedule for the MediaVerse studio zone. All positions referenced to SSOT room coordinates.

Power Distribution Overview

Safety Notice

All electrical work must be performed by a licensed electrician and comply with local electrical codes (IEC 60364 / BS 7671). The studio sub-panel is fed from the building's main distribution board. All circuits use RCD/RCBO protection.

Electrical Panel

Location
Type
Supply
Voltage / Frequency

Zone Load Summary

MetricValueNotes
Total LoadAll 3 AV circuits combined
Total CurrentAt 240V single-phase
Circuit CountDedicated MCB per room
Max Single CircuitVideo/Podcast (AV-03)
IEC Headroom

Circuit Schedule

Each room receives a dedicated 16A MCB circuit with isolated ground conductor. All receptacles are Schuko Type F, 16A, studio-grade.

Outlet & Data Positions

All heights measured from finished float floor surface. Power outlets use orange isolated-ground (IG) receptacles in recording rooms. Data outlets are Cat6A S/FTP shielded.

Control Room (B311)

IDTypeWallHeightDescription

VO Live (B304)

IDTypeWallHeightDescription

Video/Podcast (B312-1)

IDTypeWallHeightDescription

Stagebox Position

One wall-mounted stagebox (SB-01) connects the Control Room to VO Live via dedicated steel conduit through Wall 6. Per S3 BOQ Issue 1, Video/Podcast records locally AND ties to Control by audio: the SNK-2 wall-mount 16×4 stagebox with a 16ch multicore (~15m) to the Control 48-pt patchbay (SN-02/SN-04), crossing the buffer spine only via the sealed, offset SN-03 sleeves.

Cable Routing

Critical Separation Rules

Routing Zones

ZoneHeight / LocationCable TypesNotes
Plenum Audio signal cables (XLR, TRS), data (Cat6A) In dedicated EMT conduit, separated from HVAC ducts
Raised Floor AC power cables Power runs under float floor to wall outlets; floor box stub-ups during construction
Buffer Spine Inter-room conduit (audio, data, video) Main cable pathway between east and west rooms
Partition Walls Within wall cavities SB-01 conduit (32mm steel) Acoustic sealed both ends; the SNK-1/SNK-2 snake crossings run under the float floor in EMT and cross the spine only via the offset, sealed SN-03 sleeves (S3 BOQ Issue 1)

Data Cabling Specifications

Cable Type
Rating
Conduit
Termination
Total Runs
Patch Panel

Cable Management

Labeling
Tie Method
Conduit Type
Conduit Fill
Crossing Rule

Grounding System

Grounding Is Critical for Audio Quality

Ground loops are the #1 cause of hum and buzz in studio installations. The star grounding topology eliminates ground loops by ensuring all equipment grounds converge at a single technical earth point.

Grounding Topology

ComponentSpecification
TopologyStar ground — all equipment grounds converge at single technical earth point
Earth PointStudio sub-panel (dedicated isolated ground bus bar)
Earthing SystemTN-S — single-point bond to building ground
IG ConductorDedicated isolated ground (IG) conductor per circuit
IG ReceptaclesOrange IG receptacles at all audio equipment positions
Room Ground BarsIsolated ground bus bar in each room, connected directly to panel earth point
Ground LiftProvisions at patchbay for troubleshooting persistent ground loops
Shield DrainCable shields terminate at source end only (pin-1 lift at destination)

Acoustic Electrical Rules

Electrical boxes, conduit penetrations, and outlet placements must preserve the acoustic integrity of STC-rated walls. These rules are non-negotiable.

RuleSpecification

Conduit Schedule

All inter-room signal and data runs use dedicated steel EMT conduit. Acoustic sealing is mandatory at every penetration point.

RunFromToViaSizeContentsSeal
C-01 Control Room VO Live Partition wall (SB-01) 32mm EMT 4x XLR + 4x TRS + 2x Cat6A + HDMI extender Fire-rated acoustic putty both ends
C-02 Video/Podcast On-set recorder / camera position Raised floor / local floor-box stubs 25mm flex Local XLR from ST-AFB1 / ST-AFB2 + short-run power / data Local run — no inter-room penetration on this run
C-03 Video/Podcast (SNK-2 16×4 stagebox) Control 48-pt patchbay Under float floor in EMT; stub-ups cast with the rafts; OFFSET steel sleeves through BOTH buffer-spine leaves (SN-03) 50mm EMT 16ch multicore (~15m) — S3 BOQ SN-02 RWA45 packing + acoustic sealant BOTH faces of BOTH leaves + putty pads + escutcheons [AC]
C-04 Sub-panel All rooms Under float floor / wall cavities 25mm EMT AC power + isolated ground conductors Acoustic sealant at every box penetration

Lighting Schedule

Lighting fixtures per room, plus recording indicator lights. All fixtures should support variable color temperature where noted.

Recording Indicators (Tally Lights)

IDLocationTypePowerControl

Power protection strategy to be determined by owner. Surge protection recommended at sub-panel level.

Power protection specification deferred to owner procurement.