← Back to Build index
Walls W1 / W2 — RSIC decoupled (no Green Glue)
Existing 300mm concrete + resilient clips + hat channel + wool + 2× gypsum (W2 uses RSIC-V) · click any drawing to zoom · acoustics5
What you need
1RSIC-1 clips (W1) / RSIC-V clips (W2) · W-01 / W-01B
Qty: 80 / 40
Different products; W2 diagonal needs RSIC-V
2Steel hat channel + fasteners · W-07E
Qty: 1 lot
Snaps into the RSIC clips
3Mineral wool 50mm · W-04
Qty: 40 m²
Fills the clip cavity
4Gypsum 12.5mm ×2 + acoustic putty pads for boxes · W-07 / W-08
Qty: per area
Putty-pad every box in the wall
Build sequence
1 Mount the resilient clips
Fix RSIC-1 clips to the concrete on the grid (W2 diagonal = RSIC-V). One rigid screw bypassing a clip defeats the whole wall.
2 Clip in the hat channel
Snap steel hat channel horizontally into the clips. The channel must float — never touch the concrete directly.
3 Infill the wool
Friction-fit 50mm mineral wool in the clip cavity. Don't compress it against the channel.
4 First gypsum layer
Screw the first 12.5mm gypsum to the hat channel only. Acoustic putty-pad behind every electrical box.
5 Second gypsum layer
Add the second 12.5mm gypsum, joints staggered. No Green Glue on W1/W2 — isolation here is by decoupling.
Golden rule: W1/W2 isolate by DECOUPLING (clips). Keep zero rigid bridges between the gypsum leaf and the concrete — one stray screw shorts it out.