Walls Bill of Materials

Wall and float floor material schedule · acoustics5 · Audience: Contractor, procurement

AC Acoustic Critical HP Hold Point

Wall Assembly Summary

WallTypeSTC LabSTC Field est.ThicknessAssembly
W1North concrete (street — the ONLY concrete wall)6558–62300mm concrete + RSIC-1 + hat channel + 50mm RW + 2×gyp (BOQ PW-01) — never through-fix to concrete outside the clips
W2West diagonal — existing GYPSUM wall + NEW independent inner leaf~60 (class)55–60~13 cm new build-upExisting gypsum wall (kept, NO fixings into it) + ≥25mm air gap + independent 70mm stud leaf w/ RWA45 + 2×12.5 SoundBloc + GG (BOQ PW-02). Mass-on-mass lining is VOID — the free-standing leaf is the only correct isolation here
W3East — existing GYPSUM leaf to B313 SERVER ROOM6255–5916 cm new build + 100mm existing air gap (kept UNFILLED) = 26cm total buildupDecoupled stud leaf (BOQ PW-04): existing gypsum leaf + ~100mm existing air gap to the B313 block wall + 70mm steel studs with RW70 + 2×16mm gyp+GG each face. B313 servers run 24/7 — the air gap is the decoupler; never bridge it
W4South — existing gypsum partition lined/rebuilt to STC 505044–4815 cm2×12.5mm gyp + Green Glue + 100mm studs+RW + 2×12.5mm gyp + Green Glue (BOQ PW-03) — hosts D1 + D5 as FRAMED openings on steel subframes; no concrete cutting, no lintels
W5Buffer spine — NEW BUILD5549–5315 cmNEW BUILD (BOQ W-07 — empty shell, nothing exists on site): double-leaf x=213.6→228.6, full depth y=0→431, 2×12.5mm gyp+GG each face on independent frames, isolated cavity, head sealed to slab. No door; only sleeved SN-03 crossings
W6VO/Control partition — NEW BUILD5347–5112 cmNEW BUILD at y=280 (BOQ W-10): 2×12.5mm gyp + 70mm studs+RW + 2×12.5mm gyp + OW-1 window + D3 framing; head sealed to slab

Perimeter Shell Isolation — BOQ mirror (PW-01..PW-05, W-07)

Per S3-SITE-TRUTH §2: perimeter isolation is NOT free mass — the north wall is the only concrete; west/south/east are gypsum. All rows are [AC] lines in BOQ Issue 1 (93 lines).
BOQ codeScopeQtyNotes
PW-01NORTH (concrete, street) — RSIC lining: A237R/RSIC-1 clips + hat channel + 50mm RWA45 + 2×12.5 Gyproc SoundBloc w/ Green Glue~30 m²The ONLY concrete wall; complete assembly supply+install AC
PW-02WEST diagonal (existing GYPSUM wall) — INDEPENDENT inner stud leaf: 70mm studs clear of the existing leaf (≥25mm air gap, NO fixings into it) + RWA45 cavity + 2×12.5 SoundBloc w/ GG~16 m²Existing wall is gypsum (SITE-TRUTH §2, photo IMG_1291) AC
PW-03SOUTH (existing GYPSUM partition) — line/rebuild to STC 50 incl. STRUCTURAL SUBFRAMES for the framed D1 + D5 openings (NO concrete cutting — stud framing only)~26 m²Hosts both heavy IAC doorsets (~75kg each) AC
PW-04EAST (existing GYPSUM leaf to B313 SERVER ROOM) — decoupled stud leaf, keep the existing ~100mm air gap UNFILLED~15 m²B313 servers run 24/7 — never bridge the gap AC
PW-05Perimeter head-to-slab seals + Green Glue sealant, all perimeter leaves, continuous1 lotFlanking control at every leaf head/edge AC
W-07BUILD the buffer spine NEW — double-leaf x=213.6→228.6, full depth y=0→431, STC 55 class, head sealed to slab1 lotNEW BUILD (empty shell — S3-SITE-TRUTH §1); primary audio↔video isolation break; no door, no penetration except the sleeved SN-03 crossings AC

Gypsum Board Schedule

TypeThicknessUsed inNotes
Standard gypsum12.5mmW4, W5, W6 — standard throughoutBrand: Saint-Gobain Gyproc SoundBloc 12.5mm (UAE) or Knauf (KSA)
Concrete-wall gypsum lining12.5mm × 2 layersW1 (north) only — 2-layer lining over RSIC clips + hat channel (PW-01)~60 m² (W1 face × 2 layers) · Gyproc SoundBloc / Knauf
New inner-leaf gypsum12.5mm × 2 layersW2 west independent inner leaf (PW-02) — free-standing stud leaf, no clips, no fixings into the existing gypsum wall~32 m² (W2 face × 2 layers) · Gyproc SoundBloc / Knauf
Heavy gypsum16mmW3 East server wall onlyHigher mass for STC 62

Insulation Schedule (Rockwool)

ProductThicknessLocationNotes
Rockwool RW7070mmStud cavities (W6 + W3 + W2 inner leaf, 70mm)W4, W5 use 100mm-stud cavities (RW100)
Rockwool RWA4550mmW1 (north) concrete wall lining (PW-01)High density — RWA45 = 45kg/m³ density class

Green Glue Schedule

ProductApplication rateWalls
Green Glue compound2 tubes per sheet of gypsumW2 (new inner leaf), W3, W4, W5
Green Glue sealantAll perimeter gapsAll walls

Resilient Clip Schedule

ProductWallNotes
RSIC-1W1 — North concrete (the only clip-lined wall)Standard resilient clip for concrete — Kinetics RSIC-1 · regional fallback: Studco Resilmount A237R (confirm ME stock at RFQ)
Hat channelW1 onlyFurring channel over RSIC clips. NOTE: the west diagonal (W2) gets NO clips — it is an existing GYPSUM wall; isolation is a free-standing independent stud leaf (PW-02), never clips-on-mass

Float Floor Materials

ItemSpecNotes
Vibration isolation padsSylomer SR28 — pads on a 400mm grid (not full coverage)
Structural deck18mm T&G plywood · 2 layers · staggered joints
Perimeter backing rodClosed-cell foam · 10mm gapAC
Perimeter sealantTremco acoustical sealantAC

Column Isolation Detail

Both structural columns require 10mm air gap box-out — do not allow float floor to contact column AC
ColumnPosition (DXF)Box-out sizeAir gap
COL_Wx=369.1, y=140.660×50 cm10mm AC
COL_Ex=762.1, y=138.160×55 cm10mm AC

Sealant Schedule

ProductLocation
Tremco acoustical sealantFloat floor perimeter + all wall/floor/ceiling junctions
Backing rod (closed-cell)Float floor perimeter gap prior to sealant
Hilti CFS-P PA putty padsAll electrical back-boxes in STC-rated walls — dual fire + acoustic seal
Hilti CP 606 + CFS-C P collarsFirestop — rated penetrations