Overview
Acoustic Doors
3 (D1, D3, D5)
Observation Window
1 (OW-1)
Highest STC
D1 / D5 — STC 50
Sound Lock
Buffer spine + D3
Door Schedule
| ID | Location | STC | Size (cm) | Weight | Wall | Brand |
|---|---|---|---|---|---|---|
| D1 | South wall, x=479cm (centre) → Video/Podcast (opens out; landing + security hinges) | 50 | 90 × 220 | ~75 kg | Wall 4 (STC 50) | IAC Noise-Lock (via Gulf Acoustic LLC, Dubai) |
| D3 | VO/Control partition, x=163.6cm (centre) | 45 | 80 × 220 | ~55 kg | Wall 6 (STC 53) | AKINCO doorset Rw45 (Dubai; TR alt Dimak) |
| D5 | South wall, x=90cm (centre) — Control external entry (opens out) | 50 | 90 × 220 | ~75 kg | Wall 4 (STC 50) | IAC Noise-Lock (via Gulf Acoustic LLC, Dubai) |
D-07 — Framed openings (BOQ): the D1 + D5 openings are NEW FRAMED OPENINGS in the SOUTH GYPSUM STUD wall — steel subframe/posts + head per the IAC doorset schedule; the subframe carries the ~75 kg leaf + slam loads; weatherseal D5. NO concrete cutting, NO lintels — the south wall is a stud wall (S3-SITE-TRUTH §2/§5); no usable existing openings exist on site. D-08: external threshold LANDINGS + step/ramp at D1 + D5 (inside FFL +150mm vs corridor slab) — landings BEFORE either door is hung; internal D3 threshold = SPLIT plate, one half per raft.
Per-Door Hardware
| Component | D1 | D3 | D5 |
|---|---|---|---|
| Frame gauge | 16ga steel | 18ga steel | 16ga steel |
| Frame corners | Welded, sand/lead-filled | ||
| Hinges | 4× heavy-duty SS | 3× heavy-duty SS | 4× heavy-duty SS |
| Hinge rating | 100 kg minimum rated | ||
| Perimeter seal | Magnetic compression seal, continuous, all 4 sides | ||
| Drop seal | D3: Athmer Schall-Ex L-15/30 WS automatic drop seal (+1 spare set) · D1/D5: IAC factory-integral seals — no field additions | ||
| Neoprene gasket | Perimeter backup seal | ||
| Head gap | 20mm sealant bed | 18mm | 20mm sealant bed |
Door Leaf Construction (All Doors)
Asymmetric layered construction for maximum STC performance:
Outside →
Steel outer ........... 1.2mm
Butyl rubber .......... 1.5mm
MDF ................... 15mm
Rockwool RWA45 ........ 50mm core
MDF ................... 15mm
Butyl rubber .......... 1.5mm
Steel inner ........... 0.8mm (asymmetric)
← Inside
Steel outer ........... 1.2mm
Butyl rubber .......... 1.5mm
MDF ................... 15mm
Rockwool RWA45 ........ 50mm core
MDF ................... 15mm
Butyl rubber .......... 1.5mm
Steel inner ........... 0.8mm (asymmetric)
← Inside
Asymmetric design: Different steel thicknesses (1.2mm outer vs 0.8mm inner) prevent coincidence — both faces resonate at different frequencies, improving broadband STC.
Observation Window OW-1
Size
80 × 50 cm
Sill height
110cm AFF
STC
50
Tilt
5° (prevents flutter echo)
Frame
Welded steel, rubber-isolated from wall
Seal
EPDM compression, desiccant in air gaps
Position
VO/Control partition (W6), x=47.7
Partition Y
280
Brand
IAC Noise-Lock window
Triple-Pane Construction
Glass ................. 6mm
Air gap ............... 100mm
Laminated glass ....... 10mm
Air gap ............... 75mm
Glass ................. 8mm
Air gap ............... 100mm
Laminated glass ....... 10mm
Air gap ............... 75mm
Glass ................. 8mm
Asymmetric air gaps: 100mm + 75mm prevents coincidence resonance between panes. Different glass thicknesses (6/10/8mm) further decouple resonant frequencies.
Sound Lock Concept
The buffer spine (W5, STC 55) combined with D3 (STC 45) forms the acoustic buffer protecting VO Live from the corridor. D2 deleted (Rev2) — Control is entered only by external door D5, so the buffer's Control-side face is now a sealed wall with no door penetration, which improves isolation.
This is why the buffer spine exists — it's not just a corridor wall, it's the core of the isolation strategy protecting the most critical rooms.
Maintenance Checklist
| Check | Frequency | Method |
|---|---|---|
| Seal inspection (all 4 sides) | Every 6 months | Visual + light test (no visible light through closed door) |
| Drop seal function | Every 6 months | Close door, verify seal drops and contacts threshold |
| Hinge torque | Annually | Check for sag, tighten if needed |
| Magnetic seal contact | Every 6 months | Paper test — paper should not slide through when door closed |
| Window seal (OW-1) | Annually | Visual inspection of EPDM compression |